|
Services |
|
|
|
Capital Works Expertise
Standards · Standards development; · Equipment selection; · Standard design development; · Standard topology development; · Standard panel development; · Condition monitoring algorithm development; · Enterprise integration; · Integration tool development.
Project Scope and Development · User requirements specification; · Functional design specification;
Project Design · Detailed design; · Documentation; · Drawings; · Settings; · HMI Design.
Project Construct · Panel manufacture; · Equipment installation; · Equipment interconnection.
Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) · Test plan development; · Non-conformance documentation. · Functional testing; · Communication network performance testing; |
|
Maintenance Expertise
· Fault diagnosis and repair; · Communication network performance optimization; · System optimization; · Fibre optic network repair; · TCP/IP network repair; · Serial communications repair; · Spares Management; · 24/7 repair service; · High Voltage protection relay configuration and testing; · Protocol diagnosis (DNP3.0, MODBUS, IEC60870-5-103, IEC61850).
|
|
|



|
Copyright ROBSAL © (Aust) 2014 |
|
tm |