Services

Text Box:


Capital Works Expertise

 

Standards

· Standards development;

· Equipment selection;

· Standard design development;

· Standard topology development;

· Standard panel development;

· Condition monitoring algorithm development;

· Enterprise integration;

· Integration tool development.

 

Project Scope and Development

· User requirements specification;

· Functional design specification;

 

Project Design

· Detailed design;

· Documentation;

· Drawings;

· Settings;

· HMI Design.

 

Project Construct

· Panel manufacture;

· Equipment installation;

· Equipment interconnection.

 

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT)

· Test plan development;

· Non-conformance documentation.

· Functional testing;

· Communication network performance testing;

Maintenance Expertise

 

· Fault diagnosis and repair;

· Communication network performance optimization;

· System optimization;

· Fibre optic network repair;

· TCP/IP network repair;

· Serial communications repair;

· Spares Management;

· 24/7 repair service;

· High Voltage protection relay configuration and testing;

· Protocol diagnosis (DNP3.0, MODBUS, IEC60870-5-103, IEC61850).

 


Text Box:

Copyright ROBSAL © (Aust) 2014

tm